FIGR / UI TEMPLATE

Bridge Inspection Findings

Review civil structure defects, condition ratings and repair deadlines.

Explore this table as a reference for Urban Planning & Transportation Infrastructure software. The sample records include Bridge BR-04 deck crack and BR-08 bearing. Use their tasks and edge cases to adapt this pattern to your own product and design system. All examples are fictional.

Bridge Inspection Findings

BUILD ON THIS

Make it yours in Figr.

Explore this screen, then bring in your own product and design system to shape the next version.

Use this template ↗

At a glance

Screen

Table

Primary action

Open record

Pattern

table with searchable records, filters, selection and status feedback

State

Default, Selected, Filtered, Empty, Loading, Warning, Error, Success

Design system

Independent product UI reference; no 1mg assets

What this screen helps with

Review Bridge BR-04 deck crack against BR-08 bearing, spot blockers and open record while preserving ownership and status.

What to look for

  • Example records: Bridge BR-04 deck crack; BR-08 bearing.
  • Owners: City Planner and Mobility Analyst.
  • Work area: Central Corridor.
  • Fictional KPI: Open work items (51).
  • Action: Open record.

States to consider

  • Default: show the sample table.
  • Selected: show details for Bridge BR-04 deck crack.
  • Filtered: narrow by needs review or record text.
  • Empty: explain a lack of matching records and offer reset.
  • Loading: keep the layout steady.
  • Warning: flag tasks requiring review.
  • Error: let users retry and preserve their work.
  • Success: confirm open record.

Where it fits

Projects → Networks → Open record

Patterns in this screen

table, record selection, filtering, status chips, sample task feedback

UX choices to review

Make records easy to search, scan and filter.

  • Connect Bridge BR-04 deck crack to City Planner and Central Corridor.
  • Clearly separate Needs review and Complete without relying on color alone.
  • Show clear retries when a record cannot load or save.

Try a similar screen in Figr

Help our team adapt Bridge Inspection Findings to an existing product. Read our Figma design system, current flows, components, data rules and permissions. Explore two workable layouts for open record with sample cases like Bridge BR-04 deck crack and BR-08 bearing. Build a design our team can edit, including default, selected, filtered, empty, loading, warning, error and success states. Treat these sample records as fictional.

Open Figr

KEEP EXPLORING

More ways to approach your next screen.

Browse other product UI examples, compare patterns, and pick the direction that suits your product.

Explore all 500 templates ↗